• strict warning: Non-static method view::load() should not be called statically in /home/r1v3rsm3/public_html/sites/all/modules/views/views.module on line 879.
  • strict warning: Declaration of views_handler_argument::init() should be compatible with views_handler::init(&$view, $options) in /home/r1v3rsm3/public_html/sites/all/modules/views/handlers/views_handler_argument.inc on line 0.
  • strict warning: Declaration of views_handler_filter::options_validate() should be compatible with views_handler::options_validate($form, &$form_state) in /home/r1v3rsm3/public_html/sites/all/modules/views/handlers/views_handler_filter.inc on line 0.
  • strict warning: Declaration of views_handler_filter::options_submit() should be compatible with views_handler::options_submit($form, &$form_state) in /home/r1v3rsm3/public_html/sites/all/modules/views/handlers/views_handler_filter.inc on line 0.
  • strict warning: Declaration of views_handler_filter_boolean_operator::value_validate() should be compatible with views_handler_filter::value_validate($form, &$form_state) in /home/r1v3rsm3/public_html/sites/all/modules/views/handlers/views_handler_filter_boolean_operator.inc on line 0.
  • strict warning: Declaration of views_plugin_row::options_validate() should be compatible with views_plugin::options_validate(&$form, &$form_state) in /home/r1v3rsm3/public_html/sites/all/modules/views/plugins/views_plugin_row.inc on line 0.
  • strict warning: Declaration of views_plugin_row::options_submit() should be compatible with views_plugin::options_submit(&$form, &$form_state) in /home/r1v3rsm3/public_html/sites/all/modules/views/plugins/views_plugin_row.inc on line 0.
  • strict warning: Non-static method view::load() should not be called statically in /home/r1v3rsm3/public_html/sites/all/modules/views/views.module on line 879.

Phase 1 of the work includes:

1. Raising and insulating the floor and installing underfloor heating

2.  Install cavity wall insulation + 70mm Kingspan External wall insulation and Silicone Render.

3.  300mm of Thermafleece sheep's wool insulation in loft.

4.  Install Monodraught Sunlight Tubes to first floor.

5. Replacing the existing single glazed windows with wooden framed double glazed window

6. Installing a condensing boiler

This will be the first phase of a three phase strategy for the Riversmeet resource centre.

Phase 2

The second phase is to use the upgrading of the building as a demonstration model for how to upgrade existing buildings and improve their thermal efficiency. Local residents can then come and see how we did the upgrade, what our limitations were and how we made the decisions.

Phase 3

The third phase is to extend our into the community with an energy project and we are currently bidding into a COOP bid for both technical and financial resource to develop this project.

Our aim is to use local suppliers and craftsmen wherever possible.